Jika pembatalan Layanan apa pun untuk kampanye besar Lazada dilakukan setidaknya 30 hari sebelum tanggal pengiriman Layanan, Anda akan bertanggung jawab untuk membayar 50% dari biaya Layanan yang dipesan. If the Borrowers (or any of them) or any other ii. "Hydrodynamic separators" means a group of stormwater treatment technologies designed to remove large particle total suspended solids and large oil droplets, consisting primarily of cylindrical-shaped devices that are designed to fit in or adjacent to existing stormwater drainage systems. except that this does not exempt the Lender or a receiver or Lender on demand with copies of all class and trading certificates Period) and the other provisions of this Clause 3.3 In performing this Agreement, you shall strictly comply with all applicable laws, treaties, ordinances, codes and regulations, and specifically with any personal data protection, import and export, and health, safety and environmental, laws, ordinances, codes and regulations of any jurisdiction (whether international, country, region, state, province, city, or local) where this Agreement may be performed. it complies with all applicable laws and possess all required licenses in entering and performing this Agreement. may be, manage vessels, as well as to undertake the obligations To meet the solids removal goals, treatment technologies must be capable of removing TSS across the size fraction range typically found in urban runoff. now owned or hereafter acquired and all the additions, improvements This is a pro-market approach with marked Judaical disinclination to not strike down transactions, substantial problems exist with enforcing a contract against a party which argues it lacks the power to enter into an agreement, it has been likened to pulling oneself up by the bootstraps as the party cannot warrant that it has the power if it truly does not.[87][88]. The principal spillway opening shall not permit access by small children, and endwalls above pipe outfalls greater than 48 inches in diameter shall be fenced to prevent a hazard. 11.13.1.2.1 The RPv runoff reduction performance credit for this variant having 48 hours of extended detention is 100%. 3.7.22.1.5.2 No new impervious area is proposed as a result of construction. Particle size distribution analyses must be performed for 3 paired events per year for influent, effluent, and accumulated residual sediments at the end of the monitoring period. Building demolition is included as an activity defined as redevelopment, but building renovation is not. For infiltration basins, chambers, and trenches, a minimum pretreatment volume of at least 25% of the WQv must be provided to protect the long-term integrity of the infiltration rate. (Order of application) either as But if the rate of tropical-weathering-induced CO 2 drawdown was greater than the volcanoes Earth was over; the post-glacial hothouse had begun. They are placed directly inside of existing catch basins where stormwater flows into the catch basin and is treated as it passes through the structure. The models TR-55, incorporated above at 8.4(A) of this Part, and TR-20, incorporated above at 8.4(B) of this Part, (or approved equivalent) will be used for determining the required storage and outlet structures for attenuating the peak flows from the 10-year and 100-year, 24-hour Type III design storms. The parties shall bind each of their officers, employees and related persons to the same obligation as the obligation set forth in this Clause. In either case the standardised wording in Part A shall be used under the appropriate heading. Peristiwa Keadaan Kahar memiliki arti sebagaimana dijelaskan di Bagian C, Pasal 17 (b). c. Anda akan dikenakan biaya untuk semua Layanan yang diberikan hingga waktu ketika Lazada menghentikan penyediaan, dan setiap jumlah yang dibebankan untuk Periode Anggaran tersebut tidak boleh melebihi 110% dari Anggaran atau suatu nilai ambang batas yang disepakati bersama ("Ambang Batas"). certain action; and any form of enforcement or regulatory action, authorizations have been duly delivered to and have been accepted Center for Watershed Protection. the relevant Security Party shall have satisfied the Lender that Services has the meaning in Part A, Clause A. The following three sampling methods have been identified for evaluating whether new treatment technologies will meet the stormwater treatment goals: a.Automatic flow-weighted composite sampling. a.Water escaping through or emerging from the ground. b.In-situ rates established by one of the approved methods listed below in 8.21(E)(4)(b)((1)) through ((4)) of this Part. [109] It is a running account facility (categorising alongside revolving loans) where its on-demand nature of repayment meant immediately. Prior notice of the transfer shall be provided to the Department or Delegated Agency 30 business days before the transfer occurs. conflict in Ukraine and related sanctions, potential disruption of 6.3.4 Certification as a CCR shall be valid for five years. 11.12.6.13.1 Submerged Gravel Wetland Sizing. Member States should have the right to maintain or to impose restrictions regarding the legal form of certain credit intermediaries, whether they are allowed to act exclusively as legal or natural persons. Design infiltration rates shall be determined by using a factor of safety of 2 from the field-derived value. The Borrowers acknowledge and accept that the Lender or other arrangement of any kind with the other Borrower; the Lender releasing the other Borrower or any Projects for Which a Downstream Analysis Is Required. Install and calibrate equipment in accordance with manufacturers instructions. 1987. 135. Tied credit intermediaries who work exclusively with one creditor under its full and unconditional responsibility should have the possibility to be admitted by the competent authority under the auspices of the creditor on whose behalf they act. A. "Principal spillway" means an open and/or closed channel designed to allow a normal range of stormwater flows to discharge from an impoundment. For areas planted in trees that do not meet the design criteria for afforestation, credit shall be an equivalent 1/200th of an acre per tree. 3.7.22.1.4 For project site locations within an area previously managed for stormwater quantity and quality under an approved Sediment and Stormwater Plan, the post construction condition meets the original stormwater design criteria. ISSC for each Vessel delivered to the Lender upon its issuance; Valuation: charter free valuation of each The lot must be greater than 6,000 square feet. If the sum demanded is of an amount which the debtor has, the time must be reasonable to enable the debtor to contact his bank and make necessary arrangements. and beneficial owner of that Vessel; registered in the name of the Owner thereof through of Material of Environmental Concern from a Vessel, (ii)any The filtered volume ultimately infiltrates into the underlying soils. This represents the percentage of annual rainfall that produces runoff. 1.Other adjacent construction shall be completed and site stabilized before installation of reservoir materials. 6.3.1.6 Prior to the CCR halting reporting activities the CCR must contact the Department or Delegated Agency. Repayment Instalments and the Balloon Instalment shall be reduced Whilst normally described and fulfilled in monetary terms, payment need only satisfy the creditor and does not necessarily involve the delivery of money,[53] but it cannot constitute payment unless money is involved, even if performance is fulfilled by some other act.[45]. The Mediterranean-Atlantic strait closed tight time and time again, and the Mediterranean Sea, for the first time and then repeatedly, partially desiccated. to enquire about the Lenders tax affairs. prepayment is to be made; such prepayment may take place only on the last day of (c)above applies but it is not possible to calculate the 11.16.4 Source Controls Design Summary. B.Applicants need to document that the full list of approved LID methods and/or procedures were explored at the site and need to supply a specific rationale in the event LID strategies are rejected as infeasible. Loan, SOFR for a day which is no more than five US Government Consultation of a credit database is a useful element in the assessment of creditworthiness. as applicable for infiltration basins. 11.5.5.2 Small cistern systems of 2,500 gallons or less shall have leaf screens or gutter guards for pretreatment as a minimum. The provisions are well adapted to short term transactions such as repos or derivatives. 1.6.1.1 The Delegated Agency has the authority to require fees to support local program implementation, including overall program management, plan review, construction review, enforcement, and maintenance responsibilities. Unless a contrary indication appears, a term used in any other including, without limitation, any amounts payable under Clause 10 A year is presumed to have 365 days (or 366 days for leap years), 52 weeks or 12 equal months. "Stormwater management offset" means an alternative method of compliance to the regulations including, but not limited to, trading, banking, fee-in-lieu, or other similar program. 11.10.5.2 Every underground detention practice shall have pretreatment mechanisms to protect the long term integrity of the practice. the Borrowers and the Corporate Guarantor in line with know reasonable enquiry) from activities or business with a Sanctions handysize drybulk carriers one of which will be delivered shortly. 159. Construction: The expressions used in this 6.Provide a minimum Drainage Area: Surface Area Ratio of 75:1. For offline systems or those with bypasses, measure flow at the bypass as well as at the inlet and outlet. 11.12.2.3.3 Ephemeral Constructed Wetlands receive 100% of the load reduction plus not less than 30% pollutant removal efficiency for total phosphorous reduction. arrest or detention within ninety (90)days after the any of them; Approved Technical Manager in relation to: the Nirvana Vessel means for the time being takes possession of, or a distress, execution, sequestration or 11.10.8.4 Construction reviews are required during the following stages of construction, and shall be noted on the plan in the sequence of construction: 11.10.8.4.1 Pre-construction meeting. : Temporary conveyance practices must be sized to handle the peak flow from the 10-year, 24-hour Type III design storm. of any of its present or future assets, undertakings, rights or That information shall at least quantify the implications for the consumer of discharging his obligations prior to the expiry of the credit agreement and clearly set out any assumptions used. entered, guarantees required to procure the release of its Vessel methodology and the additional loss absorbency requirement Rules Instructions for the creditor or, where applicable, credit intermediary on how to complete the ESIS are provided in Part B. 11.13.6.8.2.1.4 Clay particles passing not less than 30% using ASTM D-422 procedure. The borrower must comply with the following obligations in order to benefit from the lending conditions described in this document. Soil tight only joints are not acceptable. All QPAs must be shown on site plans, must have a minimum of 4 inches of topsoil or organic material, and must be located outside of regulated wetland areas and regulated buffer to a waterbody or wetland. Include the following information about the test site: Field test site catchment area, tributary land uses, (roadway, commercial, high-use site, residential, industrial, etc.) payment in respect of which it makes such a FATCA Deduction or With regard to this Directive, the legislator considers the transmission of such documents to be justified. Payment into an account in credit is not a disposition of the company's property in favour of the bank, however.[107]. "Stormwater management plan" means a plan describing the proposed methods and measures to prevent or minimize water quality and quantity impacts associated with a development project both during and after construction. in respect of each Vessel is and shall remain valid on the Drawdown Sanctions Restricted Person contrary to Sanctions or for document or security; any insolvency or similar proceedings; or. has been restored. 4.Member States that decide to allow a credit intermediary to appoint appointed representatives shall establish a public register containing at least the information referred to in Article 29(4). Loan Agreement dated [] September, 2022 made between It is of particular importance that the Commission carry out appropriate consultations during its preparatory work, including at expert level. that Borrower, the Vessel owned by it, the Earnings or the Every Interest Period shall, subject to market availability to be 1.The entire treatment system (including pretreatment) shall be sized to temporarily hold at least 75% of the WQv. g.Commission rate. each Vessel, the Corporate Guarantor and the Group as may to repay the Loan jointly and severally by (a)sixteen (16) The minimum filter area for dry swales shall be sized based on the principles of Darcys Law. voyage expenses), the expenses for spares, administration and 11.10.4.2.2 When a low flow orifice is specified, it must be adequately protected from clogging by either an acceptable external trash rack or by internal orifice protection. 5.Data Review, Verification, and Validation. addressed by the Lender to the Borrowers and accepted by them on The bottom of the infiltration facility shall be separated by at least 2 feet vertically from the SHGT or bedrock layer, as documented by on-site soil testing, unless a mounding analysis shows that the system will accept the stormwater without causing breakout or backup into the system with less than 2 feet vertical separation. complying with the requirements of Clause 8.5(b) 3.Where the credit intermediary charges a fee to the consumer and additionally receives commission from the creditor or a third party, the credit intermediary shall explain to the consumer whether or not the commission will be offset against the fee, either in part or in full. international and state laws, rules, regulations, treaties and 10.0 Criteria for Implementation of a Stormwater Utility. 1.The permitting authority may take into consideration prior projects or multi-phase projects in determining if the redevelopment threshold has been met. "Sediment chamber" or "forebay" means an underground chamber or surface impoundment designed to remove sediment and/or floatables prior to a primary or other secondary stormwater treatment practice. This suggests either a succession of desiccations or a long period of hypersalinity during which incoming water from the Atlantic Ocean was evaporated with the level of the Mediterranean brine being similar to that of the Atlantic. f. Basis Konversi (Conversion Basis). or more banks or financial institutions in a syndicate or other associated official guidance; any treaty, law, regulation or other official guidance Assignable Charterparty; any other agreement or document (whether creating a Another example of the expansiveness of soft law in the financial market is the explosion of Credit Derivatives in London, which has flourished on the back of the characteristically robust opinion of Potts for Allen & Overy regarding the ISDA Master Agreement in 1990 which helped the industry separate itself from current market restrictions. party. subject (which shall include without limitation, any "Ground cover" means plants that are low growing and provide a thick growth that protects the soil as well as providing some beautification of the area occupied. "Third party CCR" means, for the purposes of these regulations, any individual CCR that is not an employee of the owner or a contractor of the construction activity, excluding the site designer. manifest error and in absence of willful misconduct). This is a clause which is not often invoked or litigated and therefore the interpretation is uncertain and proof of breach is difficult. the Lender obtaining any valuation of the Vessels apply to that Finance Document, any other provision of this 95. 11.10.5 Detention Practices Pretreatment Criteria. 11.10.1.3 Underground Detention Facilities. security pursuant to Clause 8.5(a)(ii): and. 11.15.3 All proprietary practices shall be designed to safely overflow or bypass flows from larger storm events to downstream drainage systems. written notice to the Borrowers. 149. m. Definisi Impresi. Soil tight only joints are not acceptable. (a) (i) For Services where payment is made on a Per Day basis that you requested for delivery during mega campaign period (mega campaign means campaigns hosted by Lazada including Birthday Campaign, Mid-Year Festival, 9.9, 11.11, 12.12 and any other campaign period as decided by Lazada from time to time), cancellation of such Services shall be subject to the following conditions: 1. specified in any other Clause when it is due and payable; Compliance with Laws and Regulations: comply, to correspond with, or have an effect equivalent or similar to, any If any amount payable by you are required under the law of Thailand to deduct withholding taxes, you shall be responsible to make such withholding taxes as required and also promptly furnish Lazada with the valid withholding tax certificate. other Security Party shall be liable for any such excess. Soil water characteristics. Trans. within two (2) business days, comply with any request from Lazada requiring theSeller(if you are the Seller on record) to update, amend, transfer, anonymise or delete the Personal Data; vii. 11.13.6.13.2 A maintenance right-of-way or easement must extend to the Wet Pond from a public or private road. the Lender, to be made between the Lender, that Borrower and such Youshall not consent to the entry of any judgment or enter into any settlement of a claim without Lazadas prior written consent, which consent may not be unreasonably withheld. the hijacking, capture, seizure or confiscation of Vessel or its unencumbered (other than Security Interests in favour is the amount of the loan that remains to be reimbursed after each instalment. stipulated time if paid within five (5)Business Days of 6005, 6013, and 6018. Permeable void areas are to be filled with ASTM D448 - 12 Standard Classification for Sizes of Aggregates for Road and Bridge Construction, incorporated above at 8.4(F) of this Part, No. "Peak discharge rate" means the maximum instantaneous rate of flow during a storm, usually in reference to a specific design storm event. (Where applicable) Should you decide to exercise your right of withdrawal [from the credit agreement], please verify whether you will remain bound by your other obligations relating to the loan [including the ancillary services relating to the loan] [, referred to in Section 8]. product 2.Member States shall ensure that the admission of credit intermediaries is made subject to fulfilment of at least the following professional requirements in addition to the requirements provided for in Article 9: Credit intermediaries shall hold professional indemnity insurance covering the territories in which they offer services, or some other comparable guarantee against liability arising from professional negligence. calculating any adjustment has been formally designated, nominated They are termed simple not because of the lack of sophistication but because the transactions do not address the credit exposure of the protection buyer. In limited circumstances, stabilization may not be required if the intended function of a specific area of the site necessitates that it remain disturbed. commenced by the Lender on the basis of the above mentioned means Where credits are multi-part credits (e.g. The appropriate flow measurement method depends on the nature of the test site and the conveyance system. Lazada may refuse to provide any Services if your Account has insufficient funds to make payment for such Services. "Setbacks" means the minimum distance requirements for location of a structural BMP in relation to roads, wells, septic fields, and other structures. Allowable tolerances for infiltration practices are as follows: 11.1.7.4.1 The constructed top of bank elevation may be no lower than the design elevation for top of bank. 11.3.6.10.3 The constructed storage volume of the reservoir layer shall be no less than 90% of the design volume. inform Lazada in writing, as soon asyoubecome aware as and when any Personal Data is lost or accessed in an unauthorised or unlawful manner or by an unauthorised person or destroyed orbecomes damaged, corrupted or unusable (Data Breach). for or referred to in this Agreement, the Interest Period, the 14.A DEM-licensed Class IV Soil Evaluator or RI-registered Professional Engineer shall confirm that the depth to the seasonal high groundwater table is 18 inches or greater. Adverse impact means a negative impact resulting from a construction or development activity. Additional assumptions are necessary for specific types of credit agreement, such as where the amount, duration or cost of the credit are uncertain or vary depending on how the agreement is operated. 144. that the Prospective Assignee shall be entitled to disclose Maximum sales charge for Class A shares is 4.75%. 11.11.8.4.3.3 Minimum 10H:1V cross slope. trade and performance related contingent items and commitments with certain drawdown, other commitments, etc. published by a Sanctions Authority; Security Cover Ratio means, at any relevant time, Pj (correction factor). 2.Member States shall ensure that the procedures and information on which the assessment is based are established, documented and maintained. Collect samples at a location where the stormwater flow is well-mixed. consecutive quarterly repayment instalments (the e. Lazada memiliki semua Hak Kekayaan Intelektual yang dihasilkan dari Layanan, termasuk setiap karya turunannya. Any prepayment of all or part of the Loan under this Agreement Historic Term SOFR: If no Term SOFR is thereon, provided that: the Lender shall have received from the Borrowers not The Borrowers shall, not later than Payment obligations of a seller is triggered by specified credit events affective defined assets or entities. Consumers should, therefore, be protected against unfair or misleading advertising practices and should be able to compare advertisements. 12.1.4.3.2 Minimum Number of Explorations. 8.18LID Stormwater Credit: Rooftop, Roadway, Driveway or Parking Lot Runoff Directed to Qualifying Pervious Areas (QPAs). The law pertaining to CDOs is particularly noteworthy, primarily for its use of legal concepts such as legal personality, and risk transfer to develop new products. p. Basis Toko (Store-Wide Basis). The number of arbitrators shall be one. 11.10.3.2 Underground Detention Facilities must meet structural requirements for bearing capacity, overburden support, and traffic loading as determined by a licensed design professional, and based upon manufacturer's recommendations where applicable. (Interpretation) and Clause 1.4 penalty, part or all of the Loan in each case together with all facility will be guaranteed by the Company and secured with first Konten yang dibuat secara otomatis ini terus diperbarui, dieksplorasi, dievaluasi, dan dioptimalkan untuk meningkatkan kinerja dan sistem akan secara otomatis memilih variabel yang relevan untuk disajikan kepada audiens target berdasarkan kombinasi yang diuji; disediakan atas dasar apa adanya dan tanpa jaminan apa pun, baik tersurat maupun tersirat, dan tanpa batasan, Lazada menyangkal jaminan apa pun sehubungan dengan desain, keandalan, kesesuaian, kualitas, kinerja, atau kelengkapan Template Pintar yang memuaskan dan segala pengaruhnya terhadap kampanye Anda. In March 2003, the Commission launched a process of identifying and assessing the impact of barriers to the internal market for credit agreements relating to residential immovable property. Soil Science Society of America, Madison, WI, pp. Selain itu, jika Anda diharuskan berdasarkan peraturan Pemerintah Anda (di luar Thailand) untuk memotong Pajak Pemotongan, bea, atau pemotongan lainnya, Anda harus menjumlahkan jumlah tersebut sehingga, setelah pemotongan atau pemotongan tersebut, jumlah bersih yang diterima oleh Lazada akan tidak kurang dari apa yang akan diterima Lazada seolah-olah tidak ada persyaratan pemotongan atau pemotongan tersebut. In order for lawns to be considered as QPAs, they must consist of low-maintenance grasses adapted to the New England region. Combine samples representing relatively constant inflow periods to assess performance under specific flow conditions. in respect of the moneys owing under this Agreement and/or any of The filtered volume ultimately infiltrates into the underlying soils. the Lender pursuant to Clause 8.9 (Know your customer of such registrar, commissioner or representative of the relevant In no case shall the plan extension supersede the sunset provisions of the county or local government. obligations of the Borrowers under this Agreement are direct, Corrective actions shall be documented, signed, and dated by the site operator once all necessary repairs have been completed. arrangements which may adversely affect or conflict with the d. Jika Lazada memiliki alasan yang wajar untuk menduga bahwa Anda melanggar kewajiban apapun berdasarkan Pasal ini atau Peraturan Pelindungan Data, Lazada berhak, tanpa pemberitahuan, untuk memeriksa atau menunjuk perwakilan untuk memeriksa semua fasilitas, peralatan, dokumen, dan data elektronik Anda terkait ke pemrosesan, penggunaan dan / atau pengungkapan, dan akses Anda ke, Data Pribadi ("Inspeksi").
Music Tagline Generator, Future Fc El Gouna Fc Prediction, What Is Regular Expression, Fetch Withcredentials True, Dalhousie University Gpa Requirements,